FAS Media Library FAS Phase 1 Weir explainer video This video shows how the FAS1 moveable weirs operate Phase 1 Update Construction update FAS1 The Leeds Flood Alleviation Scheme – 5 Years on. FAS1 Construction Fly Through December 2015 – Fly through FAS1 Construction Fly Through April 2016 – FAS1 Construction Fly through End of project with Timelapse May 2018 – Timelapse video of the end of project flyover End of project (Short) March 2018 FAS Phase 2 Digital Model Digital Model created by Arup 2017 Digital Model Digital Model 2019 How Calverley FSR Operates Increase streaming setting to 1080p FAS Construction Benefits Summary of the features and benefits of the whole FAS Scheme FAS2 Construction Drone Calverley Dam Flood December 2022 Calverley Dam Flood (Short) December 2022 Progress Drone Flyover September 2023 Calverley Timelapse November 2024 Apperley Bridge Timelapse November 2024 Armley Mills Timelapse November 2024 FAS2 Final Drone Flyover March 2025 – Natural Flood Management (NFM) Leeds FAS NFM Benefits Upper Aire catchment benefits created by deploying nature-based solutions